S4 Tower certificate for top floor has been issued now after some work has resumed under the Covid 19 lockdown 4. The tower was completed on March 18,2020.
Categories
S4 Tower certificate for top floor has been issued now after some work has resumed under the Covid 19 lockdown 4. The tower was completed on March 18,2020.