{"id":435,"date":"2018-01-09T09:47:48","date_gmt":"2018-01-09T09:47:48","guid":{"rendered":"http:\/\/pcb.net.in\/blog\/?p=435"},"modified":"2018-01-09T09:47:48","modified_gmt":"2018-01-09T09:47:48","slug":"greater-noida-metro-trial-starts-operations-expected-to-start-in-3-4-months","status":"publish","type":"post","link":"http:\/\/pcb.net.in\/blog\/2018\/01\/09\/greater-noida-metro-trial-starts-operations-expected-to-start-in-3-4-months\/","title":{"rendered":"Greater Noida metro trial starts. Operations expected to start in 3-4 months"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full\" src=\"http:\/\/images.indianexpress.com\/2018\/01\/delhi-metro-aqua-line.jpg\" width=\"756\" height=\"422\" \/><\/p>\n<p>A four-coach Metro train made its first official test run at 3.30pm on Tuesday on a section of the 29.7km Aqua Line connecting Noida and Greater Noida. Passenger operations on the 21-station corridor, according to the Noida Metro Rail Corporation (NMRC), are &#8220;three to four months&#8221; away, if there are no glitches along the way. Full-fledged trials along the whole corridor are likely to start by March.<\/p>\n<p>Read the full article here &#8211; https:\/\/timesofindia.indiatimes.com\/city\/noida\/you-may-be-able-to-take-a-ride-on-noida-metro-in-3-4-months\/articleshow\/62344553.cms<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A four-coach Metro train made its first official test run at 3.30pm on Tuesday on a section of the 29.7km Aqua Line connecting Noida and Greater Noida. Passenger operations on the 21-station corridor, according to the Noida Metro Rail Corporation (NMRC), are &#8220;three to four months&#8221; away, if there are no glitches along the way. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,2],"tags":[],"class_list":["post-435","post","type-post","status-publish","format-standard","hentry","category-updates-solitaire","category-solitaire"],"_links":{"self":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/435","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/comments?post=435"}],"version-history":[{"count":1,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/435\/revisions"}],"predecessor-version":[{"id":436,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/435\/revisions\/436"}],"wp:attachment":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/media?parent=435"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/categories?post=435"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/tags?post=435"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}