{"id":1696,"date":"2021-05-22T10:22:56","date_gmt":"2021-05-22T10:22:56","guid":{"rendered":"http:\/\/pcb.net.in\/blog\/?p=1696"},"modified":"2021-05-22T10:24:56","modified_gmt":"2021-05-22T10:24:56","slug":"internal-finishing-update-22-5-21","status":"publish","type":"post","link":"http:\/\/pcb.net.in\/blog\/2021\/05\/22\/internal-finishing-update-22-5-21\/","title":{"rendered":"Internal finishing Update 22.5.21"},"content":{"rendered":"<p>Internal Plaster near finishing in S2\/S3\/S4 &amp; by June end both Internal\/ external 1st color coat for S2\/S3\/S4 expected to be completed, subject to force measure conditions. Tiling in all above three towers in full swing.<\/p>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Internal-plaster-S4-2021-05-22-768x1024.jpeg\" alt=\"\" class=\"wp-image-1697\" srcset=\"http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Internal-plaster-S4-2021-05-22-768x1024.jpeg 768w, http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Internal-plaster-S4-2021-05-22-225x300.jpeg 225w, http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Internal-plaster-S4-2021-05-22.jpeg 960w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption>S4 Plaster in progress 22.5.21<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Internal-plaster-S4-2021-05-22-1-768x1024.jpeg\" alt=\"\" class=\"wp-image-1698\" srcset=\"http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Internal-plaster-S4-2021-05-22-1-768x1024.jpeg 768w, http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Internal-plaster-S4-2021-05-22-1-225x300.jpeg 225w, http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Internal-plaster-S4-2021-05-22-1.jpeg 960w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"981\" src=\"http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Floor-tiles-S4-2021-05-22.jpeg\" alt=\"\" class=\"wp-image-1699\" srcset=\"http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Floor-tiles-S4-2021-05-22.jpeg 1024w, http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Floor-tiles-S4-2021-05-22-300x287.jpeg 300w, http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/Floor-tiles-S4-2021-05-22-768x736.jpeg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Floor Tiles <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"893\" src=\"http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/floor-tiled-2021-05-22.jpeg\" alt=\"\" class=\"wp-image-1700\" srcset=\"http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/floor-tiled-2021-05-22.jpeg 1024w, http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/floor-tiled-2021-05-22-300x262.jpeg 300w, http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2021\/05\/floor-tiled-2021-05-22-768x670.jpeg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Internal Plaster near finishing in S2\/S3\/S4 &amp; by June end both Internal\/ external 1st color coat for S2\/S3\/S4 expected to be completed, subject to force measure conditions. Tiling in all above three towers in full swing.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,40],"tags":[20],"class_list":["post-1696","post","type-post","status-publish","format-standard","hentry","category-solitaire","category-society-news","tag-construction-updates"],"_links":{"self":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1696","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/comments?post=1696"}],"version-history":[{"count":2,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1696\/revisions"}],"predecessor-version":[{"id":1702,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1696\/revisions\/1702"}],"wp:attachment":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/media?parent=1696"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/categories?post=1696"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/tags?post=1696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}