{"id":1268,"date":"2020-01-09T07:28:03","date_gmt":"2020-01-09T07:28:03","guid":{"rendered":"http:\/\/pcb.net.in\/blog\/?p=1268"},"modified":"2020-01-31T07:13:24","modified_gmt":"2020-01-31T07:13:24","slug":"money-makes-money","status":"publish","type":"post","link":"http:\/\/pcb.net.in\/blog\/2020\/01\/09\/money-makes-money\/","title":{"rendered":"Money Makes Money"},"content":{"rendered":"\n<p>Money Makes Money<\/p>\n\n\n\n<p>\u2026..is a centuries old well established idiom &amp; compliments investing members in our Project because of:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>as reported in PWC Techno-feasibility report about $22 Billion investment will be made on account of one of the World Largest Greenfield Airport Project, to be constructed by Zurich Airport. <\/li><li>As reported &amp; mentioned in Wikipedia, world largest Infra Project valuing $100 billion Delhi\u2013Mumbai Industrial Corridor Project in Phase-1 itself, will have one of its eight investment centre in Dadri-Noida-Ghaziabad. <\/li><\/ol>\n\n\n\n<p>The Ministry of Commerce and Industry had proposed the establishment of a US$90 billion revolving fund with matching contribution from India and Japan to kick-start the implementation process of the US$90 billion Delhi Mumbai Industrial Corridor Project.The icing on the cake is that 1st instalment of $4.5 billion was being initially funded by the Japanese government as a loan for a period of 40 years at a nominal interest of 0.1% and the work has already started in Dadri-Noida-Gaziabad investment centre on 747.5 acres of Area. The corridor will span 1483 km. <\/p>\n\n\n\n<p>Other Salient features of the Project are as follows:<\/p>\n\n\n\n<p>a) Total employment generation of 1.2 million by 2040.<br\/>\nb) Total Revenue Generation Rs. 5042 billion.<br\/>\nc) As the Cargo will Move from Eastern Peripheral Expressway, which will connect to Yamuna Expressway for Jewar International Airport via Grand-Trunk, which is being constructed about 2kms from our Project, very huge infra development is expected to come-up shortly.<\/p>\n\n\n\n<p>Those friends, who wish to study full PWC techno-feasibility report\/ DMIC report are welcome to contact undersigned. <\/p>\n\n\n\n<p>Warmly,<\/p>\n\n\n\n<p>Team<br\/>\nPetroleum Coal &amp; Banking Executives Welfare Society <\/p>\n\n\n\n<p>Visit us at pcb.net.in<\/p>\n\n\n\n<p>For residential property on Yamuna expressway<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-embed-handler\">\nhttp:\/\/www.pcb.net.in\/project\/solitarian-city\n<\/figure>\n\n\n\n<p>For commercial Office space and Studio Apartment , immediate registry with exchange option.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-embed-handler\">\nhttp:\/\/pcb.net.in\/project\/solitarian-city-center\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Money Makes Money \u2026..is a centuries old well established idiom &amp; compliments investing members in our Project because of: as reported in PWC Techno-feasibility report about $22 Billion investment will be made on account of one of the World Largest Greenfield Airport Project, to be constructed by Zurich Airport. As reported &amp; mentioned in Wikipedia, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[42],"class_list":["post-1268","post","type-post","status-publish","format-standard","hentry","category-area-updates","tag-mailer"],"_links":{"self":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/comments?post=1268"}],"version-history":[{"count":1,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1268\/revisions"}],"predecessor-version":[{"id":1269,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1268\/revisions\/1269"}],"wp:attachment":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/media?parent=1268"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/categories?post=1268"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/tags?post=1268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}