{"id":1119,"date":"2019-09-25T05:33:29","date_gmt":"2019-09-25T05:33:29","guid":{"rendered":"http:\/\/pcb.net.in\/blog\/?p=1119"},"modified":"2019-09-25T05:33:29","modified_gmt":"2019-09-25T05:33:29","slug":"s3-s4-towers-construction-progress","status":"publish","type":"post","link":"http:\/\/pcb.net.in\/blog\/2019\/09\/25\/s3-s4-towers-construction-progress\/","title":{"rendered":"S3 &#038; S4 Towers Construction Progress"},"content":{"rendered":"<p>D. P. R on dated:-18\/09\/2019 &#8211; (S4)<\/p>\n<p>slab&amp;col- 60% column casting complete of 21st floor<\/p>\n<p>Block Work &#8211; 18th Floor (95% Complete) 17th Floor Ongoing (80% complete)<br \/>\nCPVC Work Toliet- 16th Floor (90% Complete) kitchen work on progress<br \/>\nChaukhat &#8211; 9th Floor complete, 10th on progress<br \/>\nPlaster Inside &#8211; 3rd and 4th Floor Ongoing<br \/>\nElectrical Conduting Work &#8211; 12th Floor (100% Complete), 13th Floor On-Going<br \/>\nScaffolding- on progress<\/p>\n<p>D. P. R on Dated :- 16-09-2019 (S3)<\/p>\n<p>slab &amp; Columns &#8211;<br \/>\n19th floor slab(100%) completed.<br \/>\n20th floor slab steel binding is on going (50%completed)<\/p>\n<p>Block Work &#8211;<br \/>\n18th Floor (100% Complete)<br \/>\n19th Floor Ongoing<\/p>\n<p>CPVC Work Toliet &amp; kitchen-<br \/>\n17th Floor (100% Complete)<\/p>\n<p>Chaukhat &#8211;<br \/>\n10th floor comoleted<br \/>\n11th Floor on going<\/p>\n<p>Plaster Inside &#8211;<br \/>\n2,3,4th floor completed.<br \/>\n5th and 6th Floor is On going .<\/p>\n<p>Electrical Conduting Work &#8211;<br \/>\n12th Floor (100% Complete).<br \/>\n13,14,15th Floor is On-Going.<\/p>\n<p>Railing work-<br \/>\nFront side :-<br \/>\ntill 17th floor completed.<br \/>\nBack side:-<br \/>\n1st portion till 17th floor completed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>D. P. R on dated:-18\/09\/2019 &#8211; (S4) slab&amp;col- 60% column casting complete of 21st floor Block Work &#8211; 18th Floor (95% Complete) 17th Floor Ongoing (80% complete) CPVC Work Toliet- 16th Floor (90% Complete) kitchen work on progress Chaukhat &#8211; 9th Floor complete, 10th on progress Plaster Inside &#8211; 3rd and 4th Floor Ongoing Electrical [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,40],"tags":[],"class_list":["post-1119","post","type-post","status-publish","format-standard","hentry","category-solitaire","category-society-news"],"_links":{"self":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1119","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/comments?post=1119"}],"version-history":[{"count":1,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1119\/revisions"}],"predecessor-version":[{"id":1120,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1119\/revisions\/1120"}],"wp:attachment":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/media?parent=1119"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/categories?post=1119"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/tags?post=1119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}