{"id":1072,"date":"2019-08-29T07:18:06","date_gmt":"2019-08-29T07:18:06","guid":{"rendered":"http:\/\/pcb.net.in\/blog\/?p=1072"},"modified":"2019-08-29T07:21:39","modified_gmt":"2019-08-29T07:21:39","slug":"interiors-work-progress-of-s2-speed-tower","status":"publish","type":"post","link":"http:\/\/pcb.net.in\/blog\/2019\/08\/29\/interiors-work-progress-of-s2-speed-tower\/","title":{"rendered":"Interiors work progress of S2 Speed Tower"},"content":{"rendered":"<p>Dear Friends,<\/p>\n<p>Please to share interiors work progress of S2 Speed Wing Tower, as shared by builder, as on 25-08-2019.<\/p>\n<p>1. Block Work 17th Floor Completed.<br \/>\n2. Railing ( Balcony Grill) One Side 17th floor &amp; other Side 14th floor.<br \/>\n3. CPVP Work Toilet 15th floor Completed.<br \/>\n4. Wall Conduit 7th floor in Progress.<br \/>\n5. Chaukat fixing 9th floor Completed.<br \/>\n6. Inside Plaster 5th floor going on oneside &amp; 3rd floor Other Side.<br \/>\n7. External Plaster- Scaffolding Started.<\/p>\n<p>Similarly parrel interiors are going on in S3 &amp; S4 Towers. Details of same will be shared once received.<a href=\"http:\/\/pcb.net.in\/blog\/wp-content\/uploads\/2019\/08\/S2-20th-floor-finishing-detail-Table-dt-28.8.19.pdf\">S2 20th floor finishing detail Table dt 28.8.19<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dear Friends, Please to share interiors work progress of S2 Speed Wing Tower, as shared by builder, as on 25-08-2019. 1. Block Work 17th Floor Completed. 2. Railing ( Balcony Grill) One Side 17th floor &amp; other Side 14th floor. 3. CPVP Work Toilet 15th floor Completed. 4. Wall Conduit 7th floor in Progress. 5. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40],"tags":[],"class_list":["post-1072","post","type-post","status-publish","format-standard","hentry","category-society-news"],"_links":{"self":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1072","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/comments?post=1072"}],"version-history":[{"count":1,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1072\/revisions"}],"predecessor-version":[{"id":1074,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/posts\/1072\/revisions\/1074"}],"wp:attachment":[{"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/media?parent=1072"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/categories?post=1072"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/pcb.net.in\/blog\/wp-json\/wp\/v2\/tags?post=1072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}